Selected SCADA Engineering Projects

Case studies in aircraft arresting controls, water and wastewater SCADA, HMI development and infrastructure installation, followed by our project record since 2019.

Selected Project Work

Water SCADA

Water SCADA for Twelve Nixa Sites

PLC programming, cellular telemetry, and VTScada development for a municipal water system.

Outcome: All 12 sites on one VTScada system in summer 2024. The City has since bought a GDS service plan.

Missouri

Read the project

Wastewater controls

SLC 500 to CompactLogix at Sidney's WWTP

Two SLC 500 PLCs replaced with CompactLogix 5380 controllers, with Wonderware communications updated to match.

Outcome: Both PLCs converted over three days in January 2026. The plant was back in automatic shortly after.

Sidney, Ohio

Read the project

Aviation controls

Encrypted Runway Controls in Qatar

Motorola ACE3600 controllers and encrypted PAACS for a dual-runway installation.

Outcome: Third-party controls replaced with PAACS for four barriers in 2023. The base has since bought more PAACS equipment.

Al Udeid, Qatar

Read the project

Aviation controls

New PAACS for Fort Smith and Ebbing ANGB

A seven-controller encrypted PAACS for two BAK-14 barriers on the runway Fort Smith Regional Airport shares with Ebbing Air National Guard Base.

Outcome: New encrypted PAACS installed July 2024. The base later bought a replacement unit after a pit flood.

Fort Smith, Arkansas

Read the project

Aviation controls

Encrypted PAACS at Kadena Air Base, Japan

Security-enabled ACE3600 CPUs, APX 6500 radios, a tower panel and handheld controllers for the arresting gear at Kadena Air Base.

Outcome: Encrypted PAACS installed July 2024, with continued GDS support since.

Kadena Air Base, Japan

Read the project

HMI modernization

A New HMI for Medina County

Wonderware-to-VTScada migration with existing Motorola RTUs and field communications retained.

Outcome: Live on redundant VTScada in December 2024. The County has since ordered two phases of RTU upgrades.

Ohio

Read the project

Infrastructure installation

Fire Alarm Reporting Installation in Guam

Fire alarm reporting system (FARS) installation through Booz Allen Hamilton, part of the Thunderdome program.

Outcome: Reporting panels installed for 24 fire alarm systems, March to June 2026.

Andersen Air Force Base, Guam

Read the project

Past performance

Project Record, 2019–2026

Completed and contracted work in aircraft arresting controls and water and wastewater SCADA. Private companies are described rather than named. Contract details are available on request for bid evaluations.

Aircraft Arresting Controls
YearsCustomerLocationScopePlatform
2025Joint Base CharlestonSouth CarolinaSecurity CPU and radio upgradeACE3600, APX radios
2024–2025Alpena Combat Readiness Training Center (subcontract)MichiganGas, water and heat sensors for four barrier pitsACE3600
2023–2025Fort Smith Regional Airport and Ebbing ANGBArkansasNew seven-controller encrypted PAACS for two BAK-14 barriersACE3600
2024Laughlin Air Force BaseTexasTemporary relocation of BAK-15 controls to a mobile towerPAACS
2024Kadena Air BaseJapanEncryption upgrade, tower panel and handheld controllersACE3600, APX 6500
2023Morris Air National Guard BaseTucson, ArizonaBAK-14 barrier added on a second runway; system re-encryptedACE3600
2023Hill Air Force BaseUtahEncrypted tower unit and two control unitsACE3600
2022–2023Al Udeid Air BaseQatarThird-party controls replaced with PAACS for four BAK-14 barriersACE3600
2021–2022Air National Guard, 19 bases18 statesEncryption upgrade: new CPUs, radios and four MOSCAD conversionsACE3600, APX radios
2021Minot Air Force BaseNorth DakotaType H upgrade; four BAK-14 systems converted from MOSCADACE3600
2021Aircraft manufacturerMissouriNew dual-runway BAK-14 PAACSACE3600
2021Morris Air National Guard BaseTucson, ArizonaEncrypted CPUs and radios for six sitesACE3600, APX radios
2021Tonopah Test Range and Creech AFB crews (subcontract)NevadaPAACS training for operating crewsPAACS
2020–2021Joint Base AndrewsMarylandDual-runway BAK-14 PAACS retrofit, pit sensors and shop unitACE3600
Water and Wastewater SCADA
YearsCustomerLocationScopePlatform
2025–2026City of SidneyOhioWastewater plant PLC migration from SLC 500CompactLogix, Wonderware
2024–2026City of ChesapeakeVirginiaMotorola SCADA parts and repair term contractACE3600
2021–2026Private water companyArizonaRTU and radio maintenance program across seven systemsMOSCAD, ACE3600
2025Arizona Department of TransportationPhoenix, ArizonaOperator interface for freeway drainage pump stationsIgnition
2025Magna Water District (subcontract)UtahPLC and cellular panel hardware integrationCompactLogix
2024–2025Medina CountyOhioWonderware to VTScada migration with redundant serversVTScada, Motorola RTUs
2024City of NixaMissouriSCADA for twelve well and tank sitesVTScada, Micro850 PLCs
2022–2024State military departmentArizonaWater treatment plant HMI and pump control, two phasesVTScada, Modicon
2022–2023Los Alamos CountyNew MexicoSCADA transition study and radio surveyStudy
2021–2023Town of SnowflakeArizonaSCADA for four wells and the wastewater plantVTScada
2019–2021Private water utilityArizonaWastewater plant HMI replacement, FIX32 to VTScadaVTScada, Modicon

Contact GDS About Your SCADA System

Send a site list, a part number or a description of the problem, and we'll reply with next steps and a rough scope.

Discuss your project