Z1DB--Relocate and Renovate Urology | 612A4-22-004| Mather, CA

Amendment 0003 extends the Proposal due date to the date and time noted on page 1, Block 11 of the SF30. All other terms and conditions remain in full force and effect. Amendment 0002 extends the proposal due date to the date and time noted on Block 11 of the SF30 and adds VAA... (Federal Government)

AviationEmergency AlertingIrrigationRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
May 30, 2025
Updated
Jun 1, 2025

GDS Notes

  • Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.
  • Confirm alerting workflow, integration points (CAD/IPAWS/etc.), and testing/maintenance expectations for sirens and comms.

Integration Checklist

  • Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
  • Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
  • Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
  • Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.