PHANTOM RANCH PERC AREA CYCLIC REPAIRS

PHANTOM RANCH PERC AREA CYCLIC REPAIRS --- ATTACHMENT: attachment_1.pdf --- SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) 1. SOLICITATION NO. 140P1525R0012 2. TYPE OF SOLICITATION SEALED BID (IFB) INVITATION FOR BID 3. DATE ISSUED PAGE OF PAGES x NEGOTIA... (Federal Government | Due 2025-07-05)

AviationEmergency AlertingIrrigationPLCRadioSCADATelemetryWater/Wastewater
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 5, 2025
Due
Jul 5, 2025
Updated
Jun 10, 2025

GDS Notes

  • Estimated value: Project Magnitude: Between $250,000 and $500,000
  • Bid bond required: Yes
  • Mandatory site visit: Yes
  • Local integrator required: No
  • Construction beyond panels: No
  • PLC details: PLCs/RTUs mentioned but brands/models not specified
  • HMI details: HMI/SCADA mentioned but specific software not specified
  • Comms details: Network infrastructure mentioned but specific media/protocols not detailed
  • Request existing site list (pump stations, wells, tanks), I/O counts, and alarm philosophy before proposing cutover.
  • Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.

Integration Checklist

  • Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
  • Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
  • Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
  • Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
  • Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.
  • Align with O&M workflows: alarms, reporting, compliance needs, and on-call response expectations.