Skip to content
Global Data Specialists

Archive · listed deadline has passed. This reference listing does not confirm an active solicitation. Check the issuing agency for amendments and current status.

Indicator, Electrical

NSN: 6620-01-219-9413 --- ATTACHMENT: attachment_1.pdf --- SOLICITATION, OFFER AND AWARD J 2. CONTRACT NO. 3. SOLICITATION NO. SPRTA1-25-R-0345 1. THIS CONTRACT IS A RATED ORDER UNDER DPAS (15CFR 7900)  4. TYPE OF SOLICITATION SEALED BID (IFB) NEGOTIATED (RFP) X RATING DO: A1... (Federal Government | Due 2025-06-30)

AviationCybersecurityEmergency AlertingPLCRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
May 30, 2025
Due
Jun 30, 2025
Updated
Jun 10, 2025

The original notice link is unavailable. Search SAM.gov using the notice title above and include inactive notices. This page remains an archive reference.

GDS Notes

  • Estimated value: No budget/value provided; offerors to propose pricing
  • Bid bond required: No
  • Mandatory site visit: Yes
  • Local integrator required: No
  • Construction beyond panels: No
  • PLC details: PLCs/RTUs mentioned but brands/models not specified
  • HMI details: HMI/SCADA mentioned but specific software not specified
  • Comms details: Network infrastructure mentioned but specific media/protocols not detailed
  • Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
  • Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.

Integration Checklist

  • Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
  • Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
  • Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
  • Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
  • Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.
  • Define remote access method, auditing/log retention, and IT/OT segmentation boundaries.