Gate Barrier Parts for Assembly
4-Finger barrier vault post assembly for RSS-2000 Wedge barrier system compatible with current unit installed at Shaw AFB Commercial Gate. This requirement includes assembly parts such as Replacement 4 Post Assembly, Timkin Greaseless Bearing Kit, Spring, Sump Pump (24VDC), an... (Federal Government | Due 2025-06-10)
AviationEmergency AlertingPLCRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
May 30, 2025
Due
Jun 10, 2025
Updated
Jun 10, 2025
GDS Notes
- Estimated value: No budget/value provided; offerors to propose pricing
- Bid bond required: No
- Mandatory site visit: Yes
- Local integrator required: No
- Construction beyond panels: No
- PLC details: PLCs/RTUs mentioned but brands/models not specified
- HMI details: HMI/SCADA mentioned but specific software not specified
- Comms details: Network infrastructure mentioned but specific media/protocols not detailed
- Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
- Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.
Integration Checklist
- Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
- Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
- Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
- Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
- Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.