BOWST Addition/ OFT Renovation, Building 321, Niagara Falls Air Reserve Station

***2 June 2025- Amendment 0002 to provide updated section specifications and drawings, updated wage decision, and extend the proposal due date to 09 June 2025 is hereby issued. Please see the attached documents for more information. ***27 May 2025 - Amendment 0001 to provide u... (Federal Government | Due 2025-06-09)

AviationCybersecurityEmergency AlertingPLCRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 26, 2024
Due
Jun 9, 2025
Updated
Jun 5, 2025

GDS Notes

  • Estimated value: The magnitude of this construction project is anticipated to be between $5 million and $10 million.
  • Bid bond required: No
  • Mandatory site visit: Yes
  • Local integrator required: No
  • Construction beyond panels: Yes
  • PLC details: PLCs/RTUs mentioned but brands/models not specified
  • HMI details: HMI/SCADA mentioned but specific software not specified
  • Comms details: Network infrastructure mentioned but specific media/protocols not detailed
  • Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
  • Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.

Integration Checklist

  • Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
  • Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
  • Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
  • Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
  • Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.
  • Define remote access method, auditing/log retention, and IT/OT segmentation boundaries.