Amend 002 - IIJA LIT ATCT, HVAC, Replace Boiler, Controls System

Amendment 002: The purpose of this amendment is to attach revision 01 to attachment 16 Att 03 230900 SF. ------------------------------------------------------------------------------------------------ Amendment 001: The purpose of this amendment is to extend the SIR closing d... (Federal Government)

AviationEmergency AlertingPLCRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 4, 2025
Updated
Jun 10, 2025

GDS Notes

  • Estimated value: No budget/value provided; offerors to propose pricing
  • Bid bond required: No
  • Mandatory site visit: Yes
  • Local integrator required: No
  • Construction beyond panels: Yes
  • PLC details: PLCs/RTUs mentioned but brands/models not specified. The RFP states that all controls shall be replaced and have the capacity to manage and expand to control all HVAC systems throughout the facility.
  • HMI details: HMI/SCADA mentioned but specific software not specified. The new system shall include a new computer interface/control work station, with Enterprise Server software installed. Contractor shall create new EBO graphic page, and create new...
  • Comms details: Network infrastructure mentioned but specific media/protocols not detailed. The contractor shall provide and install all new CAT6 cable and ring topology network as required for a fully operational system.
  • Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
  • Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.

Integration Checklist

  • Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
  • Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
  • Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
  • Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
  • Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.