Albert V. Bryan Courthouse Limited Modernization Project – Construction Pre-Solicitation Notice
The General Services Administration (GSA) requires repairs and modernizations at the AV Bryan Courthouse which include but are not limited to Lighting, HVAC, and Building Automation Systems (BAS) in the Albert V Bryan Courthouse (AVB). This contract will be funded by GSA and t... (Federal Government | Due 2025-06-11)
AviationEmergency AlertingPLCRadioRTUSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 10, 2025
Due
Jun 11, 2025
Updated
Jun 10, 2025
GDS Notes
- Estimated value: No budget/value provided; offerors to propose pricing
- Bid bond required: No
- Mandatory site visit: Yes
- Local integrator required: No
- Construction beyond panels: Yes
- PLC details: PLCs/RTUs mentioned but brands/models not specified. Task 3 mentions "DDC controls" for the chilled water plant upgrades.
- HMI details: Task 3 mentions a "proprietary Tridium Niagara Framework and front end (with native BACnet driver) control components" for the new BAS system.
- Comms details: Task 3 mentions "upgraded non-proprietary native BACnet control components" for the new BAS system, implying BACnet communication protocol will be used.
- Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
- Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.
Integration Checklist
- Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
- Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
- Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
- Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
- Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.