Skip to content
Global Data Specialists

Archive · listed deadline has passed. This reference listing does not confirm an active solicitation. Check the issuing agency for amendments and current status.

ACP LTR Bridge Trail Crossing Fence Replacement

Project Name: ACP LTR Bridge Trail Crossing Fence Replacement Magnitude: In accordance with FAR 36.204 the magnitude of this project is: Between $100,000 and $250,000. Scope of Work: Remove and replace 11,000 linear feet of fence line at the SRS Tail Bridge Crossing area. Work... (Federal Government | Due 2025-06-18)

AviationEmergency AlertingIrrigationRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 2, 2025
Due
Jun 18, 2025
Updated
Jun 3, 2025

The original notice link is unavailable. Search SAM.gov using the notice title above and include inactive notices. This page remains an archive reference.

GDS Notes

  • Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.
  • Confirm alerting workflow, integration points (CAD/IPAWS/etc.), and testing/maintenance expectations for sirens and comms.

Integration Checklist

  • Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
  • Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
  • Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
  • Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.