ACP LTR Bridge Trail Crossing Fence Replacement
Project Name: ACP LTR Bridge Trail Crossing Fence Replacement Magnitude: In accordance with FAR 36.204 the magnitude of this project is: Between $100,000 and $250,000. Scope of Work: Remove and replace 11,000 linear feet of fence line at the SRS Tail Bridge Crossing area. Work... (Federal Government | Due 2025-06-18)
AviationEmergency AlertingIrrigationRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 2, 2025
Due
Jun 18, 2025
Updated
Jun 3, 2025
GDS Notes
- Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.
- Confirm alerting workflow, integration points (CAD/IPAWS/etc.), and testing/maintenance expectations for sirens and comms.
Integration Checklist
- Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
- Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
- Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
- Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.