432 SPTS/CE Utility Monitoring Control Systems (UMCS) System Administrator (SA)
Notice to Offerors: Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government c... (Federal Government | Due 2025-07-02)
AviationCybersecurityEmergency AlertingPLCRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Apr 11, 2025
Due
Jul 2, 2025
Updated
Jun 10, 2025
GDS Notes
- Estimated value: No budget/value provided; offerors to propose pricing
- Bid bond required: No
- Mandatory site visit: Yes
- Local integrator required: No
- Construction beyond panels: No
- PLC details: PLCs/RTUs mentioned as "Level 1 and 2 devices of the Purdue Model", but brands/models not specified. The SOW mentions ensuring these devices have current and accurate logic programmed.
- HMI details: HMI/SCADA mentioned as "UMCS frontend" and "Level 4 device". Specific software is not specified, but the SA will provide technical support for the frontend applications.
- Comms details: Network infrastructure mentioned in the context of troubleshooting network connectivity at Levels 4, 2, and 1 of the Purdue Model and Layers 1, 2, and 3 of the OSI Model. Specific media/protocols are not detailed, but the SA will maintai...
- Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
- Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.
Integration Checklist
- Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
- Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
- Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
- Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
- Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.
- Define remote access method, auditing/log retention, and IT/OT segmentation boundaries.