Y1DA | 580-22-100 | REPAIR REPLACE MAIN CHILLED WATER DISTRIBUTION SYSTEM | AMENDMENT 0002
5/9/25- AMEND 0002 ADD/REMOVE PROVISIONS, CLAUSES, VERBIAGE. ____________________________________________ 5/6/25- AMEND 0001 ADD SOLICITATION DOCUMENT TO ATTACHMENTS. ____________________________________________ THIS OPPORTUNITY IS AVAILABLE ONLY TO SERVICE-DISABLED VETERAN-OW... (Federal Government | Due 2025-06-06)
Emergency AlertingPLCRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
May 6, 2025
Due
Jun 6, 2025
Updated
Jun 5, 2025
GDS Notes
- Estimated value: The magnitude of construction is between $5,000,000.00 and $10,000,000.00.
- Bid bond required: Yes
- Mandatory site visit: Yes
- Local integrator required: No
- Construction beyond panels: Yes
- PLC details: PLCs/RTUs mentioned but brands/models not specified
- HMI details: HMI/SCADA mentioned but specific software not specified
- Comms details: Network infrastructure mentioned but specific media/protocols not detailed
- Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
- Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.
Integration Checklist
- Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
- Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
- Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
- Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
- Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.