USNS WILLIAM MCLEAN Eaton Circuit Breaker

Please see attached documents for the USNS WILLIAM MCLEAN Eaton Circuit Breaker. --- ATTACHMENT: attachment_2.pdf --- MEMORANDUM Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER THE SIMPLIFIED ACQUISITION THRESHOLD Ref: (a) USNS WILLIAM MC LEAN (T-AKE... (Federal Government | Due 2025-09-03)

AviationCybersecurityPLCRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 2, 2025
Due
Sep 3, 2025
Updated
Jun 10, 2025

GDS Notes

  • Estimated value: The requirement is not expected to exceed the simplified acquisition threshold. The specific threshold is not provided in the document.
  • Bid bond required: No
  • Mandatory site visit: Yes
  • Local integrator required: No
  • Construction beyond panels: No
  • PLC details: PLCs/RTUs not mentioned
  • HMI details: HMI/SCADA not mentioned
  • Comms details: Network infrastructure mentioned but specific media/protocols not detailed
  • Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
  • Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.

Integration Checklist

  • Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
  • Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
  • Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
  • Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
  • Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.
  • Define remote access method, auditing/log retention, and IT/OT segmentation boundaries.