USNS WILLIAM MCLEAN Eaton Circuit Breaker
Please see attached documents for the USNS WILLIAM MCLEAN Eaton Circuit Breaker. --- ATTACHMENT: attachment_2.pdf --- MEMORANDUM Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER THE SIMPLIFIED ACQUISITION THRESHOLD Ref: (a) USNS WILLIAM MC LEAN (T-AKE... (Federal Government | Due 2025-09-03)
AviationCybersecurityPLCRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 2, 2025
Due
Sep 3, 2025
Updated
Jun 10, 2025
GDS Notes
- Estimated value: The requirement is not expected to exceed the simplified acquisition threshold. The specific threshold is not provided in the document.
- Bid bond required: No
- Mandatory site visit: Yes
- Local integrator required: No
- Construction beyond panels: No
- PLC details: PLCs/RTUs not mentioned
- HMI details: HMI/SCADA not mentioned
- Comms details: Network infrastructure mentioned but specific media/protocols not detailed
- Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
- Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.
Integration Checklist
- Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
- Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
- Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
- Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
- Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.
- Define remote access method, auditing/log retention, and IT/OT segmentation boundaries.