Switch Gear Maintenance at the U.S. Consulate Toronto

Date: June 05, 2025 Dear Prospective Offeror: Subject: Request for Quotes for 19CA7025Q0006 Enclosed is a Request for Quotations (RFQ) for switchgear maintenance at the U.S. Consulate General Toronto. If you would like to submit a quotation, follow the instructions in Section... (Federal Government | Due 2025-07-09)

AviationPLCRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 5, 2025
Due
Jul 9, 2025
Updated
Jun 10, 2025

GDS Notes

  • Estimated value: No budget/value provided; offerors to propose pricing
  • Bid bond required: No
  • Mandatory site visit: Yes
  • Local integrator required: No
  • Construction beyond panels: No
  • PLC details: PLCs are mentioned in the context of verifying Modbus lights are on, but specific brands or models are not specified.
  • HMI details: HMIs (Human Machine Interfaces) are mentioned in the context of verifying that all metering screens work properly, but specific software is not specified.
  • Comms details: Network infrastructure is mentioned in the context of Modbus lights on the PLCs, but specific media/protocols are not detailed.
  • Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
  • Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.

Integration Checklist

  • Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
  • Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
  • Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
  • Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
  • Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.