Archive · listed deadline has passed. This reference listing does not confirm an active solicitation. Check the issuing agency for amendments and current status.
Switch Gear Maintenance at the U.S. Consulate Toronto
Date: June 05, 2025 Dear Prospective Offeror: Subject: Request for Quotes for 19CA7025Q0006 Enclosed is a Request for Quotations (RFQ) for switchgear maintenance at the U.S. Consulate General Toronto. If you would like to submit a quotation, follow the instructions in Section... (Federal Government | Due 2025-07-09)
AviationPLCRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 5, 2025
Due
Jul 9, 2025
Updated
Jun 10, 2025
GDS Notes
- Estimated value: No budget/value provided; offerors to propose pricing
- Bid bond required: No
- Mandatory site visit: Yes
- Local integrator required: No
- Construction beyond panels: No
- PLC details: PLCs are mentioned in the context of verifying Modbus lights are on, but specific brands or models are not specified.
- HMI details: HMIs (Human Machine Interfaces) are mentioned in the context of verifying that all metering screens work properly, but specific software is not specified.
- Comms details: Network infrastructure is mentioned in the context of Modbus lights on the PLCs, but specific media/protocols are not detailed.
- Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
- Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.
Integration Checklist
- Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
- Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
- Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
- Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
- Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.