Reference record · status unverified. This reference listing does not confirm an active solicitation. Check the issuing agency for amendments and current status.
SIL MAINTENANCE
This acquisition is SOLE SOURCE to Original Equipment Manufacturer (OEM), Lockheed, 86 South Cobb Drive, Marietta, GA 30063-0001, CAGE Code Martin Aeronautics Corporation 98897. The contract action was not awarded competitively--it was awarded using Other Than Full & Open Comp... (Federal Government)
AviationPLCRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 2, 2025
Updated
Jun 10, 2025
The original notice link is unavailable. Search SAM.gov using the notice title above and include inactive notices. This page remains an archive reference.
GDS Notes
- Estimated value: No budget/value provided; offerors to propose pricing
- Bid bond required: No
- Mandatory site visit: Yes
- Local integrator required: No
- Construction beyond panels: No
- PLC details: PLCs/RTUs mentioned but brands/models not specified
- HMI details: HMI/SCADA mentioned but specific software not specified. The focus is on maintaining and configuring the existing SIL to support fielded C-5 AMP/RERP modified aircraft.
- Comms details: Network infrastructure mentioned but specific media/protocols not detailed. The SIL must be accessible to Government and other contractors supporting C-5 aircraft systems that interface with or support the C-5 avionics suite impacted by...
- Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
- Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.
Integration Checklist
- Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
- Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
- Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
- Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
- Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.