Skip to content
Global Data Specialists

Archive · listed deadline has passed. This reference listing does not confirm an active solicitation. Check the issuing agency for amendments and current status.

SALT LAKE CITY INTERNATIONAL AIRPORT DRAINAGE MASTER PLAN RFQ

RFP: SALT LAKE CITY INTERNATIONAL AIRPORT DRAINAGE MASTER PLAN RFQ. Agency: CITIES - Salt Lake City Corporation. State: UT. Due: 2025-06-27. See the source link for full requirements and attachments.

AviationPLCRadioSCADATelemetryWater/Wastewater
Type
RFP
Jurisdiction
UT - CITIES - Salt Lake City Corporation
Posted
May 28, 2025
Due
Jun 27, 2025
Updated
Jun 10, 2025

GDS Notes

  • Estimated value: No budget/value provided; offerors to propose pricing
  • Bid bond required: No
  • Mandatory site visit: Yes
  • Local integrator required: No
  • Construction beyond panels: No
  • PLC details: PLCs/RTUs mentioned but brands/models not specified
  • HMI details: HMI/SCADA mentioned but specific software not specified
  • Comms details: Network infrastructure mentioned but specific media/protocols not detailed
  • Request existing site list (pump stations, wells, tanks), I/O counts, and alarm philosophy before proposing cutover.
  • Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.

Integration Checklist

  • Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
  • Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
  • Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
  • Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
  • Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.
  • Align with O&M workflows: alarms, reporting, compliance needs, and on-call response expectations.