SALT LAKE CITY INTERNATIONAL AIRPORT DRAINAGE MASTER PLAN RFQ
RFP: SALT LAKE CITY INTERNATIONAL AIRPORT DRAINAGE MASTER PLAN RFQ. Agency: CITIES - Salt Lake City Corporation. State: UT. Due: 2025-06-27. See the source link for full requirements and attachments.
AviationPLCRadioSCADATelemetryWater/Wastewater
Type
RFP
Jurisdiction
UT - CITIES - Salt Lake City Corporation
Posted
May 28, 2025
Due
Jun 27, 2025
Updated
Jun 10, 2025
GDS Notes
- Estimated value: No budget/value provided; offerors to propose pricing
- Bid bond required: No
- Mandatory site visit: Yes
- Local integrator required: No
- Construction beyond panels: No
- PLC details: PLCs/RTUs mentioned but brands/models not specified
- HMI details: HMI/SCADA mentioned but specific software not specified
- Comms details: Network infrastructure mentioned but specific media/protocols not detailed
- Request existing site list (pump stations, wells, tanks), I/O counts, and alarm philosophy before proposing cutover.
- Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
Integration Checklist
- Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
- Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
- Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
- Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
- Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.
- Align with O&M workflows: alarms, reporting, compliance needs, and on-call response expectations.