Skip to content
Global Data Specialists

Archive · listed deadline has passed. This reference listing does not confirm an active solicitation. Check the issuing agency for amendments and current status.

Military Ocean Terminal Concord (MOTCO) Berms Construction and Dredging Project

This acquisition is proceeding as a Full and Open Competition, Invitation for Bid (IFB). This Procurement will be conducted under FSC CODE: Y1KF, NAICS Code: 237990. The size standard for this code is $45,000,000. All questions should be directed to Lisa Ip: Lisa.I.Ip@usace.ar... (Federal Government | Due 2025-07-10)

AviationCybersecurityPLCRadioSCADATelemetryWater/Wastewater
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 10, 2025
Due
Jul 10, 2025
Updated
Jun 10, 2025

GDS Notes

  • Estimated value: Estimated cost range is between $10,000,000 - $25,000,000.
  • Bid bond required: Yes
  • Mandatory site visit: Yes
  • Local integrator required: No
  • Construction beyond panels: Yes
  • PLC details: PLCs/RTUs mentioned but brands/models not specified
  • HMI details: HMI/SCADA mentioned but specific software not specified
  • Comms details: Network infrastructure mentioned but specific media/protocols not detailed
  • Request existing site list (pump stations, wells, tanks), I/O counts, and alarm philosophy before proposing cutover.
  • Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.

Integration Checklist

  • Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
  • Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
  • Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
  • Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
  • Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.
  • Align with O&M workflows: alarms, reporting, compliance needs, and on-call response expectations.