INTENT TO SOLE SOURCE: Absolute Robotic Arms Maintenance Services
Please see the attached documentation for details --- ATTACHMENT: attachment_1.pdf --- --- ATTACHMENT: attachment_2.pdf --- --- ATTACHMENT: attachment_3.pdf --- Please wait... If this message is not eventually replaced by the proper contents of the document, your PDF viewer ma... (Federal Government | Due 2025-06-09)
AviationEmergency AlertingPLCRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 2, 2025
Due
Jun 9, 2025
Updated
Jun 5, 2025
The original notice link is unavailable. Search SAM.gov using the notice title above and include inactive notices. This page remains an archive reference.
GDS Notes
- Estimated value: No budget/value provided; offerors to propose pricing. Note that line items 0005, 2005 have a ceiling amount of $10,000.00 that will be funded at time of awa...
- Bid bond required: No
- Mandatory site visit: Yes
- Local integrator required: No
- Construction beyond panels: No
- PLC details: PLCs/RTUs mentioned but brands/models not specified. The equipment being serviced are Hexagon Metrology Absolute 7 Series and 8 Series PCMM (Portable Coordinate Measuring Machine) Articulating Arms.
- HMI details: HMI/SCADA mentioned but specific software not specified. The equipment being serviced are Hexagon Metrology Absolute 7 Series and 8 Series PCMM (Portable Coordinate Measuring Machine) Articulating Arms.
- Comms details: Network infrastructure mentioned but specific media/protocols not detailed. The document focuses on the calibration and maintenance of the Hexagon Metrology Absolute Arms, not the network infrastructure they connect to.
- Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
- Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.
Integration Checklist
- Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
- Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
- Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
- Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
- Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.