Generator Maintenance VA Kerrville
The Contractor shall provide all labor, equipment, tools, materials, parts, supplies, software, transportation, supervision, and any other items and services necessary to accomplish the generator maintenance inspection and service. --- ATTACHMENT: attachment_1.pdf --- SOLICITA... (Federal Government | Due 2025-06-30)
AviationPLCRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 2, 2025
Due
Jun 30, 2025
Updated
Jun 3, 2025
GDS Notes
- Estimated value: No budget/value provided; offerors to propose pricing. However, Item 0006, 0012, 0018, and 0024 specify a Not to Exceed (NTE) amount of $10,000.00 per year f...
- Bid bond required: No
- Mandatory site visit: Yes
- Local integrator required: No
- Construction beyond panels: No
- PLC details: PLCs/RTUs mentioned but brands/models not specified. The Statement of Work references Caterpillar, Onan, WisperWatt, and Cummins generators, which likely have associated control systems.
- HMI details: HMI/SCADA mentioned but specific software not specified. The generators and ATSs likely have associated HMIs or SCADA systems for monitoring and control.
- Comms details: Network infrastructure mentioned but specific media/protocols not detailed. The generators and ATSs are located at the Kerrville Veterans Hospital, implying a local network for communication between the systems.
- Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
- Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.
Integration Checklist
- Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
- Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
- Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
- Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
- Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.