Fuel Station Upgrade and Bulk Fuel Supply
The Embassy operates a fuel distribution system comprised of two underground diesel tanks, each with a capacity of 20000 liters, one underground petrol tank with a capacity of 15000 liters, one diesel dispenser and one petrol dispenser both are located on the Embassy compound.... (Federal Government | Due 2025-07-02)
AviationPLCRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 2, 2025
Due
Jul 2, 2025
Updated
Jun 10, 2025
The original notice link is unavailable. Search SAM.gov using the notice title above and include inactive notices. This page remains an archive reference.
GDS Notes
- Estimated value: No budget/value provided; offerors to propose pricing
- Bid bond required: No
- Mandatory site visit: Yes
- Local integrator required: No
- Construction beyond panels: Yes
- PLC details: PLCs/RTUs mentioned but brands/models not specified. The fuel management system is required to have a leak detection system.
- HMI details: HMI/SCADA mentioned but specific software not specified. A fuel management software system is required, and the contractor should offer a web-based, near real-time fuel monitoring system for all fuel transactions to the vehicles at the f...
- Comms details: Network infrastructure mentioned but specific media/protocols not detailed. The Fuel Card system shall be a web-based computerized system with security structures that will provide near real-time data for fuel use. The fuel card and fuel...
- Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
- Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.
Integration Checklist
- Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
- Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
- Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
- Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
- Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.