BEQ Repair AS4212
Only General MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings. --- ATTACHMENT: attachment_1.pdf --- Repairs BEQ... (Federal Government)
CybersecurityEmergency AlertingPLCRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 2, 2025
Updated
Jun 10, 2025
The original notice link is unavailable. Search SAM.gov using the notice title above and include inactive notices. This page remains an archive reference.
GDS Notes
- Estimated value: No budget/value provided; offerors to propose pricing
- Bid bond required: No
- Mandatory site visit: Yes
- Local integrator required: No
- Construction beyond panels: Yes
- PLC details: PLCs/RTUs mentioned but brands/models not specified. Section 23 09 23.13 mentions BACnet Direct Digital Control Systems for HVAC.
- HMI details: HMI/SCADA mentioned but specific software not specified. Section 23 09 23.13 mentions BACnet Direct Digital Control Systems for HVAC, which implies an HMI/SCADA system.
- Comms details: Network infrastructure mentioned but specific media/protocols not detailed. Section 01 31 23.13 mentions Electronic Construction and Facility Support Contract Management System. Section 27 10 00 mentions Building Telecommunications Cabli...
- Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
- Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.
Integration Checklist
- Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
- Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
- Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
- Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
- Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.
- Define remote access method, auditing/log retention, and IT/OT segmentation boundaries.