Base Elizabeth City Transformer Replacement
Contractor shall provide all labor, supervision, tools, equipment, material, transportation, incidentals, fees, permits, licenses, and insurance necessary to disconnect, remove, and dispose of the existing transformer at Building 100 and replace with a new transformer in accor... (Federal Government | Due 2025-06-16)
AviationIrrigationSCADA
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 2, 2025
Due
Jun 16, 2025
Updated
Jun 3, 2025
Integration Checklist
- Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
- Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
- Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
Tip
Add a few original notes (requirements, integration considerations, clarification questions). That is what makes these pages rank and convert.