AJJY 25-1074M Repair Saipan Dorm - Andersen AFB, Guam

Andersen Air Force Base, Guam has a Design-Build construction requirement to design and fully repair Saipan Dorm B250007. DESCRIPTION OF WORK: The contractor shall design and fully repair Saipan Dorm B25007 to renovate interiors including floors, walls, ceiling, finishes, full... (Federal Government)

Emergency AlertingPLCRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 2, 2025
Updated
Jun 10, 2025

GDS Notes

  • Estimated value: $25,000,000 - $100,000,000
  • Bid bond required: No
  • Mandatory site visit: Yes
  • Local integrator required: No
  • Construction beyond panels: Yes
  • PLC details: PLCs/RTUs mentioned but brands/models not specified. The description of work includes updating HVAC and electrical systems, which often involve PLCs or RTUs, but the document does not specify any particular brands or models.
  • HMI details: HMI/SCADA mentioned but specific software not specified. The project involves updating HVAC and electrical systems, which may require HMI/SCADA systems for monitoring and control, but the document does not specify any particular software.
  • Comms details: Network infrastructure mentioned but specific media/protocols not detailed. The electrical updates include a complete replacement of the electrical distribution system, which implies network communications for monitoring and control, but...
  • Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
  • Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.

Integration Checklist

  • Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
  • Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
  • Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
  • Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
  • Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.