Aircraft Instrumentation Division (AID) Follow On

*This is a DRAFT Request for Proposal*. The Aircraft Instrumentation Division (AID), within the Digital Analytics Infrastructure and Technology Advancement (DAiTA) Group at the Naval Air Warfare Center Aircraft Division (NAWC-AD), has a follow-on requirement for technical, eng... (Federal Government | Due 2025-06-06)

AviationIrrigationRTUSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 2, 2025
Due
Jun 6, 2025
Updated
Jun 3, 2025

GDS Notes

  • Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.
  • Ask for RTU/remote panel drawings, power budgets, and spare strategy (modules, PSUs, antennas).

Integration Checklist

  • Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
  • Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
  • Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
  • Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.