Planning an HMI Migration Around Existing RTUs

Plan for existing field equipment, graphics, alarms, historical data, testing, and operator training when moving to VTScada or Ignition.

By GDS Engineering Team

An HMI migration can be a separate project from field-controller replacement. GDS's Medina County work replaced Wonderware with VTScada while retaining Motorola RTUs and field communications.

Identify What Will Change

Identify the existing application, servers, workstations, controllers, gateways, and communications. State which components remain and which change. Confirm the interface requirements before assuming the new application can communicate with the retained system.

Review Operator Tasks

Use the existing screens as a starting point, then review how operators navigate sites, interpret equipment status, acknowledge alarms, and find historical information. Identify changes they need as part of the new application scope.

Define Data and Alarm Requirements

List the points, scaling, alarm behavior, notification recipients, trends, reports, and required historical data. Specify whether existing historical data must be retained or transferred. A new historian does not automatically include the old records.

Plan User Access and Redundancy

Define user roles, remote access needs, workstation locations, and required redundancy with the system owner. These requirements should be reflected in the software, hardware, and testing scope.

Agree on Cutover and Acceptance

Identify how the new application will be checked against the field system, who coordinates the transition, and what documentation and training operators will need. GDS's ADOT project included an operating guide for its Ignition pumphouse application.

Related GDS services and equipment →

Related GDS Project Work

Contact GDS About Your SCADA System

Talk with GDS about a SCADA project, equipment selection, or support for an installed system.