Z1DA--437-25-145 Fire Hydrant Line Break 36C263-25-AP-1754
https://api.sam.gov/prod/opportunities/v1/noticedesc?noticeid=bbb6d51f212a45049bb6cc7c5c27646c (Federal Government | Due 2024-06-17)
PLCRadioSCADATelemetryWater/Wastewater
Type
RFP
Jurisdiction
Federal Government
Posted
May 17, 2024
Due
Jun 17, 2024
Updated
Jun 5, 2025
GDS Notes
- Estimated value: No budget/value provided; offerors to propose pricing
- Bid bond required: No
- Mandatory site visit: Yes
- Local integrator required: No
- Construction beyond panels: No
- PLC details: PLCs/RTUs mentioned but brands/models not specified
- HMI details: HMI/SCADA mentioned but specific software not specified
- Comms details: Network infrastructure mentioned but specific media/protocols not detailed
- Request existing site list (pump stations, wells, tanks), I/O counts, and alarm philosophy before proposing cutover.
- Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
Integration Checklist
- Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
- Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
- Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
- Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
- Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.
- Align with O&M workflows: alarms, reporting, compliance needs, and on-call response expectations.