W912HN25BA007 (W912HN25B4002) Renovate Bldg. 59D Robins AFB, GA

Meeting Minutes and Sign in Roster for Site Visit 2 has been attached below. AMD 0003 - This amendment provides an extension to the proposal due date, from 4 June 2025 to 17 June 2025 @ 1100 HRS EDT via PIEE. A second site visit has been added for 3 June 2025. Please see Site... (Federal Government | Due 2025-06-17)

CybersecurityPLCRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 10, 2025
Due
Jun 17, 2025
Updated
Jun 10, 2025

GDS Notes

  • Estimated value: The magnitude of this construction project is anticipated to be between $25,000,000 and $100,000,000.
  • Bid bond required: No
  • Mandatory site visit: Yes
  • Local integrator required: No
  • Construction beyond panels: Yes
  • PLC details: PLCs/RTUs mentioned implicitly as part of the HVAC control system that requires cybersecurity. Brands/models not specified.
  • HMI details: HMI/SCADA mentioned implicitly as part of the HVAC control system that requires cybersecurity. Specific software not specified.
  • Comms details: Network infrastructure mentioned implicitly as part of the HVAC control system that requires cybersecurity. Specific media/protocols not detailed.
  • Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
  • Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.

Integration Checklist

  • Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
  • Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
  • Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
  • Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
  • Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.
  • Define remote access method, auditing/log retention, and IT/OT segmentation boundaries.