Skip to content
Global Data Specialists

Archive · listed deadline has passed. This reference listing does not confirm an active solicitation. Check the issuing agency for amendments and current status.

Schneider Electric Programmable Logic Controller (PLC) Automation Hardware

This is a Brand Name requirement from Schneider Electric for Programmable Logic Controller (PLC) automation hardware. The distributor shall be Authorized/Certified through the Schneider Electric Alliance Industrial Automation Distributor (IAD) program. If vendor is not, your q... (Federal Government | Due 2025-06-06)

AviationPLCRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 2, 2025
Due
Jun 6, 2025
Updated
Jun 5, 2025

The original notice link is unavailable. Search SAM.gov using the notice title above and include inactive notices. This page remains an archive reference.

GDS Notes

  • Estimated value: No budget/value provided; offerors to propose pricing
  • Bid bond required: No
  • Mandatory site visit: Yes
  • Local integrator required: No
  • Construction beyond panels: No
  • PLC details: Modicon PLCs are specified. The following models and quantities are required: - BMXXBE2005: 2 - BMEXBP0800: 2 - BMXCPS4002: 2 - BMXDDI3232: 11 - BMXFTB4000: 17 - BMXDDI1602: 1 - BMXFTB2000: 4 - BMXDDO1602: 3 - BMXDDO3202: 6
  • HMI details: HMI/SCADA is implied as existing systems are being maintained and expanded, but no specific software is named.
  • Comms details: Ethernet backplane is specified for the BMEXBP0800 rack.
  • Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
  • Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.

Integration Checklist

  • Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
  • Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
  • Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
  • Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
  • Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.