Rockwell Automation software maintenance renewal for PSNS&IMF

HC102825R0043 (Reference 832572276). The Government intends to issue a sole source order to North Coast Electric Company for Rockwell Automation Rslogix software maintenance renewal for Puget Sound Naval Shipyard & Intermediate Maintenance Facility. The period of performance i... (Federal Government | Due 2025-06-16)

AviationPLCRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 10, 2025
Due
Jun 16, 2025
Updated
Jun 10, 2025

GDS Notes

  • Estimated value: No budget/value provided; offerors to propose pricing
  • Bid bond required: No
  • Mandatory site visit: Yes
  • Local integrator required: No
  • Construction beyond panels: No
  • PLC details: PLCs are implied as the Rockwell Automation Rslogix software maintenance renewal is for the Puget Sound Naval Shipyard & Intermediate Maintenance Facility. Specific PLC models are not detailed, but the software supported includes 'A-B 98...
  • HMI details: HMI software support is included in the maintenance renewal, specifically 'A-B 9800-DC8HMICOM 8-5-HMI & COMM SOFTWARE SPT TECH SUPPORT'. The solicitation implies maintaining existing HMI/SCADA software rather than installing new.
  • Comms details: Network infrastructure is implied as the Rockwell Automation software maintenance renewal includes support for 'INFORMATION AUTOMATION SOFTWARE SUPPORT 8X5 M-F TECH SUPPORT' (A-B 9800-DC8INFAUT) and 'PORTAL SUPPORT' (A-B SF-0000172618-Q5...
  • Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
  • Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.

Integration Checklist

  • Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
  • Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
  • Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
  • Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
  • Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.