N--DATA CENTER HVAC UPGRADE
DATA CENTER HVAC UPGRADE, WESTERN AREA POWER ADMINISTRATION, DESERT SOUTHWEST REGION, PHOENIX, AZ (Federal Government)
PLCRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 10, 2025
Updated
Jun 10, 2025
GDS Notes
- Estimated value: No budget/value provided; offerors to propose pricing
- Bid bond required: No
- Mandatory site visit: Yes
- Local integrator required: No
- Construction beyond panels: No
- PLC details: PLCs/RTUs mentioned but brands/models not specified. The project involves HVAC controls, which typically use PLCs or RTUs, but the title does not specify brands or models.
- HMI details: HMI/SCADA mentioned but specific software not specified. HVAC systems often integrate with HMI/SCADA systems for monitoring and control, but the title does not specify the software.
- Comms details: Network infrastructure mentioned but specific media/protocols not detailed. Communication between HVAC equipment and a central control system is implied, but the title doesn't specify the communication protocols or media used.
- Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
- Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.
Integration Checklist
- Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
- Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
- Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
- Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
- Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.