Maintenance & Repair of Fire and Smoke detection systems

The purpose of this Requirement is to inspect, conduct preventive maintenance, and repair services for Fire and Smoke detection systems IAW the attached Performance Work Statement (PWS) draft as well as Attachments 1-3. These systems are located within housing, troop, and admi... (Federal Government)

PLCRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 2, 2025
Updated
Jun 10, 2025

GDS Notes

  • Estimated value: The price ranges provided are: * EUR 700,000.00 - 800,000.00 * EUR 800,000.00 - 900,000.00 * EUR 900,000.00 - 1,000,000.00
  • Bid bond required: No
  • Mandatory site visit: Yes
  • Construction beyond panels: No
  • PLC details: PLCs/RTUs mentioned but brands/models not specified
  • HMI details: HMI/SCADA mentioned but specific software not specified
  • Comms details: Network infrastructure mentioned but specific media/protocols not detailed
  • Project insights: {"bid_bond_required": "No bid bond requirement mentioned", "mandatory_site_visit": "No mandatory site visit mentioned", "integrators_required_local": "This requirement is intended for local sources IAW FAR 5.202.", "construction_beyond_panels": "No construc...
  • Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
  • Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.

Integration Checklist

  • Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
  • Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
  • Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
  • Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
  • Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.