Life Support Services Orchard Combat Training Center (OCTC) June 2025

https://api.sam.gov/prod/opportunities/v1/noticedesc?noticeid=cb6509567a8e42b2ab421fbabc09ab88 (Federal Government | Due 2024-07-15)

PLCRadioSCADATelemetryWater/Wastewater
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 15, 2024
Due
Jul 15, 2024
Updated
Jun 5, 2025

GDS Notes

  • Estimated value: No budget/value provided; offerors to propose pricing
  • Bid bond required: No
  • Mandatory site visit: Yes
  • Local integrator required: No
  • Construction beyond panels: No
  • PLC details: PLCs/RTUs mentioned but brands/models not specified
  • HMI details: HMI/SCADA mentioned but specific software not specified
  • Comms details: Network infrastructure mentioned but specific media/protocols not detailed
  • Request existing site list (pump stations, wells, tanks), I/O counts, and alarm philosophy before proposing cutover.
  • Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.

Integration Checklist

  • Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
  • Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
  • Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
  • Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
  • Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.
  • Align with O&M workflows: alarms, reporting, compliance needs, and on-call response expectations.