Department of State Worldwide Design/Build and Construction Project Indefinite Delivery/Indefinite Quantity Contracts

This is a Pre-Solicitation Notice – interested companies do NOT need to submit any documentation at this time. The solicitation for Phase I will be posted on SAM.gov at a later date, please see below for further information. The U.S. Department of State (DOS) has a requirement... (Federal Government)

PLCRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 2, 2025
Updated
Jun 10, 2025

The original notice link is unavailable. Search SAM.gov using the notice title above and include inactive notices. This page remains an archive reference.

GDS Notes

  • Estimated value: IDIQ Contract Minimum Guarantee: $40,000 per IDIQ Contract. Estimated IDIQ Maximum Ceiling: $800 million per IDIQ.
  • Bid bond required: No
  • Mandatory site visit: Yes
  • Local integrator required: No
  • Construction beyond panels: No
  • PLC details: PLCs/RTUs mentioned but brands/models not specified
  • HMI details: HMI/SCADA mentioned but specific software not specified
  • Comms details: Network infrastructure mentioned but specific media/protocols not detailed. The successful offeror will be required to use AutoCAD Release 2011 or higher and REVIT Architecture 2011. This program will be required for the electronic trans...
  • Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
  • Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.

Integration Checklist

  • Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
  • Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
  • Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
  • Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
  • Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.