City of Paden City Wastewater Treatment Facility Improvement, Phase II - Section 219
https://api.sam.gov/prod/opportunities/v1/noticedesc?noticeid=bc65872b6bc04d20bd463adaa9a700ac (Federal Government | Due 2024-06-03)
PLCRadioSCADATelemetryWater/Wastewater
Type
RFP
Jurisdiction
Federal Government
Posted
May 4, 2024
Due
Jun 3, 2024
Updated
Jun 5, 2025
GDS Notes
- Estimated value: No budget/value provided; offerors to propose pricing
- Mandatory site visit: No
- Local integrator required: No
- Construction beyond panels: No
- PLC details: PLCs/RTUs mentioned but brands/models not specified
- HMI details: HMI/SCADA mentioned but specific software not specified
- Comms details: Network infrastructure mentioned but specific media/protocols not detailed
- Project insights: {"bid_bond_required": "Section 00 21 13 - INSTRUCTIONS TO BIDDERS states: \"Bid security in the amount of five percent (5%) of the total bid amount shall accompany each bid.\"", "mandatory_site_visit": "Section 00 11 13 - ADVERTISEMENT FOR BIDS states: \"A...
- Request existing site list (pump stations, wells, tanks), I/O counts, and alarm philosophy before proposing cutover.
- Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
Integration Checklist
- Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
- Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
- Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
- Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
- Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.
- Align with O&M workflows: alarms, reporting, compliance needs, and on-call response expectations.