16--REFUEL CTRL PANEL,C, IN REPAIR/MODIFICATION OF

CONTACT INFORMATION|4|N723.01|JA4|215-697-4324|carol.a.burke7.civ@us.navy.mil| COMMERCIAL PRODUCT PROCUREMENT NOTICE|5|||||| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8||||||||| WIDE AREA WORKFLOW PAYME... (Federal Government)

PLCRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 10, 2025
Updated
Jun 10, 2025

GDS Notes

  • Estimated value: No budget/value provided; offerors to propose pricing
  • Bid bond required: No
  • Mandatory site visit: Yes
  • Local integrator required: No
  • Construction beyond panels: No
  • PLC details: PLCs/RTUs mentioned but brands/models not specified
  • HMI details: HMI/SCADA mentioned but specific software not specified
  • Comms details: Network infrastructure mentioned but specific media/protocols not detailed
  • Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
  • Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.

Integration Checklist

  • Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
  • Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
  • Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
  • Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
  • Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.