USNS YUMA (T-EPF 8) Chill Water Regulating Valves

Please see attached revised documents for the chill water regulating valves for use onboard the USNS YUMA (T-EPF 8). --- ATTACHMENT: attachment_3.pdf --- Date: 30 APR 2025 MEMORANDUM Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER THE SIMPLIFIED ACQU... (Federal Government | Due 2025-06-30)

PLCRadioSCADATelemetry
Type
RFP
Jurisdiction
Federal Government
Posted
Jun 2, 2025
Due
Jun 30, 2025
Updated
Jun 10, 2025

GDS Notes

  • Estimated value: No budget/value provided; offerors to propose pricing
  • Bid bond required: No
  • Mandatory site visit: Yes
  • Local integrator required: No
  • Construction beyond panels: No
  • PLC details: PLCs/RTUs are not explicitly mentioned in the provided text. The focus is on the chill water regulating valves.
  • HMI details: HMI/SCADA is not explicitly mentioned in the provided text. The focus is on the chill water regulating valves.
  • Comms details: Network infrastructure mentioned but specific media/protocols not detailed
  • Confirm PLC platform, firmware, programming environment, and whether standard libraries/naming conventions are required.
  • Clarify communications path (licensed/unlicensed/cellular), polling rates, and any radio path study or coverage constraints.

Integration Checklist

  • Confirm existing site inventory, I/O counts, and any required standards (tagging, alarms, naming).
  • Request current drawings, network diagrams, and as-built documentation (or plan for discovery).
  • Define acceptance testing: FAT/SAT steps, cutover plan, and rollback expectations.
  • Confirm PLC platform, programming environment, licensing, and source code handoff requirements.
  • Clarify communications path, latency constraints, polling rates, and any coverage/path study requirements.